Alterations and additions
In accordance with Clause 2.6.3, where a switchboard replacement is carried out OR where any alteration to an existing final subcircuit is undertaken, additional RCD protection shall be installed.Where socket-outlets are added to an existing sub-circuit, RCD protection need only be fitted at the commencement of the additional wiring.